Qube - Logo

Single Phase Smart Meter Installation

Step-by-step wiring for a Qube single-phase prepaid meter. MCB, P1, P2, room load, and optional DG sensing for one circuit in India.

Qube Team · · 3 min read · 10 minutes · Easy

Qube single phase line diagram showing the MCB, phase input, neutral, room load, and optional DG sensing wire

Use this guide for one Qube meter on one phase: a PG room, a hostel room, or a room circuit that also feeds an AC. The supply on the meter face is 240V, 10–60A, 2-wire, 50Hz.

Walk the same terminals on the interactive wiring guide. This page is the written version you can send to the electrician.

Before anyone opens the cover

Switch off the supply at the distribution box. Test the phase and neutral with a voltage tester and confirm both are dead. Keep the supply off until every screw is tight and the cover is back on.

Have the meter, a 2-pole MCB as shown on the line diagram, a voltage tester, and the WiFi name and password for the property. Do not work live.

Terminals on this meter

MarkWhat lands there
P1Phase input from the MCB. Red on the diagram.
P2Neutral input. Black on the diagram.
L1Neutral out to the room, AC, or other circuit. Black on the diagram.
L2Phase out, paired with L1. Red on the diagram.
D- and D+Data. Not a power connection.
D and GDG sensing, and only if this site needs it.

Single phase line diagram

Land the mains

Bring the phase and neutral from the distribution box into a 2-pole MCB. The diagram labels the incoming pair Mains Line. The MCB is the switch that stays open while the meter terminals are exposed.

From the MCB:

  1. Take the phase, labelled Phase – Input, to P1.
  2. Take the neutral, labelled Neutral Wire, to P2.
  3. Tug each conductor. A loose neutral will show up as a bad reading after you restore power.

Leave toward the room

L1 is the neutral out. L2 is the phase out. The diagram calls this pair Phase – Load, for the room, the AC, or the other circuit on this meter.

On a PG or hostel room, that load is lights, the fan, and plug points. If the AC is on this same circuit, it is included. Do not borrow a neutral from a neighbouring room.

DG sensing

The diagram marks a separate conductor as DG Sensing Wire, and it says "if required". Land it on D and G only when the property actually senses diesel generator supply. Skip it on a room with no DG input. Do not put power on D- or D+.

After the cover is on

Restore the supply. The display should light and show a reading. Pair the meter to the property WiFi from the Qube app, then confirm it is online on the dashboard and that a test recharge reaches this room.

If the display stays dark, switch the supply off again and recheck P1, P2, L1, and L2 against the diagram before you look at WiFi.

Other meters on the same property

A supply with only R and B uses the two phase installation guide. A flat or panel on R, Y, and B uses the three phase installation guide.

Frequently asked questions

Which rooms use the single-phase meter?

Use it for one circuit on one phase. That is the usual meter for a PG or hostel room, including a room whose AC is on that same circuit.

What do P1, P2, L1, and L2 mean?

P1 is phase in from the MCB. P2 is neutral in. L1 is neutral out. L2 is phase out to the room or AC. Match these to the marks printed on the meter before you tighten the screws.

Do I always connect the DG sensing wire?

No. Connect D and G only when the site needs DG sensing. A normal room with no DG input leaves those terminals empty.

Who terminates the wires?

A licensed electrician isolates the supply, proves it dead, and lands the conductors. The property team can pair WiFi and check the dashboard after the cover is on.

More installation guides

All installation guides

Get rid of manually recording & collecting electricity bills of your rental space.

Switch to Qube's Smart, Effortless & Automated Electricity Billing System

Ideal for PGs, hostels, educational institutions, offices, societies, and businesses of any size.

Buy Now